4  BATTERY HOLDERS
    4  CONNECTORS
    4  FUSEHOLDERS
    4  INDICATORS
    4  SWITCHES
    4  OVERLOAD PROTECTOR
    4  STAR RELAY
    4  GTMS
    4  THERMAL FUSE
    4  GLASS
    4  CIRCUIT PROTECTION
    4  POWER DISTRIBUTION CENTERS
    4  OEM/ODM
    4  DOTITE Sliver Paste
    4  Electro Luminescence Material
    4  Wall Mount
Home >> Product >> Product Detail

YK-620 Series | High Temperature Putty

Characteristics


Super high temparature resistance,cold resistance and resistance to changing tempe-rature

It is specially applied on substrates with thermal and cold requirements such as e-ngine hood and the mechanical surface that generate high temperature and applicati-on in spraying of powder coating


Application

 
Steel panel,iron panel,glass fiber and any painted metallic surface



Application mixing ratio

Putty :Hardener(by weight)=100:1.5-3


Note:Pot Life 5-7min (according to the temperature and ratio of Hardener)


Application reference

1. Completely remove the rust,oil dirt,water and so on from the surfaces,keep the coated surfaces clean before scraping.

2. The Putty and Hardener should be mixed completely to achieve the uniformity of
colour.

3. The mixture of Putty and Hardener should be used up before gelling.

4. Scrape the mixture of Putty and Hardener into the spot defects which will be fi-lled and scrape to evenness immediately.

5. In case of scraping of thick coat.it is preferable to apply in thin coats for s-everal times till reaching the obiective thickness.

6. Sanding affer mixture is hardened(50-90min20¡æ) .

7. Sanding paper

Main performance Indexes
 Item  performance Index
1
Density (g/cm3)
1.7¡À0.05
2
Adhesion(Pull and method)Mpa
¡Ý6Mpa
3 Fiexibility (mm)
50--70
4
Impact strength (kg¡¤Cm)
¡Ý30£¨ kg.cm £© No peel-off at ¡Ý20(kg.Cm)
5
Thermal resistance(200¡À2) ¡æ1h
No crack , No bulge
6 Temperature Variation Resistance(3 cycles)
No crack , No peel-of
     
  Note:temperature varistion resistance: 120¡À1¡æ¡Á1h->25¡À1¡æ¡Á0.5h-> -50¡À1¡æ¡Á1h
  as one cycle


Notices

1. The mixed Putty must bi used up within the available period before gelling.or it will gel.

2. When there is air bubble while application,fully scrape to evenness with scraper to ensure good adhesion.


3. Immediate baking at 200¡æ should not be conducted until curing for 8-20 hours.

4. Containers which are opened must be carefully resealed,the Putty mixed with har-deners should not be returned to the original container.

5. Store in a cool place where the temperature is below 25¡æ,The shelf life is one-year.

Date:2008Äê2ÔÂ25ÈÕ11:23:44     [ Back ]
2007© Copyright by D&Y Technology Co.,Ltd. Support:innoNT
Tel:+86-755-26067336 86036415 Fax:+86-755-86036416 E-mail:info@dytechnology.net
Add:Floor 8,Jinhui Bldg,Nanhai Blvd,Nanshan Shenzhen,518054,P.R.CHINA,518054,P.R.CHINA